PROGRAM ISSUE ** THIS INFORMATION HAS NOT BEEN VERIFIED **
Date Format is incorrect in Sage MAS Intelligence
Entry Type: Program Issue
Product: Sage MAS Intelligence
Application: n/a
Version Reported: 4.40
Status:
This issue is being researched by Engineering.
Subject:
Date Format is incorrect in Date Selections, Reports and Drill-Downs in Sage MAS Intelligence
Steps to Duplicate:
In ABC company:
- Open Report Manager
- Expand Dashboard Object
- Highlight Dashboard Analysis 2-0(MAS) and click Run icon
- Note the Date format in the Enter Report Parameters window is incorrect. Issue also occurs in Report Drill-Down
Expected Behavior:
Date Format should default to MM/DD/YYYY or determined from system settings
Possible Workaround:
None